News

Featured Project: from design to future-proof office

10-03-2016
In January 2015, a fire reduced a large part of the office of KONI Oud-Beijerland to ashes and 344 days after the fire, a new, future-proof office building has been built.
  • 2025 © STAKA Bouwproducten B.V.
  • PostAds
  • All rights reserved.