News

New: Roof access hatch with zero heat loss

placehold

19-06-2017

Thermally broken construction  Our design was led by the need to improve the insulation of the roof access hatch. Staka tested material...

CE - Marking

placehold

25-06-2015

What does the CE marking mean? If a product bears a CE marking, you can assume that the product meets the relevant legal requirements relat...

The Green Deal is a disappointing failure

placehold

15-09-2014

The Green Deal, launched in January 2012, was designed to help make energy-saving improvements to homes (insulation, heating, draught-proofing, do...

London Design

placehold

09-09-2014

Over the Festival period there are hundreds of events taking place across London encompassing a wide range of design diciplines. The many partner ...

UK sales office

placehold

01-09-2014

Phil : With 6 years involved in Sales I feel that I still have a lot to learn and since joining Staka earlier in the year, this has been t...

The European construction market - a look forwards

placehold

12-07-2014

The UK Government’s construction strategy sets an ambitious target for the construction product manufacturers; a 50% reduction in the trade ...

A brighter future for the construction industry

placehold

11-07-2014

You can find the report from buildshow.co.uk here.    

Ecobuild

placehold

13-05-2014

 

Saving energy with the new roof sheet with crushed white slate

placehold

11-03-2014

In response to demand from the market, Derbigum is expanding its range of white roofing. White roofing reflects sunlight, resulting in passive coo...

Reducing failure costs with 3D models of Staka roof access hatches

placehold

02-08-2013

The 3D models of Staka roof access hatches can be obtained through the Trimble 3D Warehouse at sketchup.com. The 3D models of roof access hatches ...

Loading page...